SLS

  • NASA

    Full Moon over Artemis II

    A full moon is seen shining over NASA’s SLS (Space Launch System) and Orion spacecraft, atop the mobile launcher at Launch Pad 39B at NASA’s Kennedy Space Center in Florida in the early hours of February 1, 2026. The agency concluded a wet dress rehearsal for the agency’s Artemis II test flight early Tuesday morning, successfully loading cryogenic propellant into…

    Read More »
  • NASA

    NASA’s Orion Spacecraft at Launch Pad

    NASA’s Orion spacecraft, which will carry the Artemis II crew around the Moon, sits at the launch pad on Jan. 17, 2026, after rollout. It rests atop the SLS (Space Launch System) rocket. Orion can provide living space on missions for four astronauts for up to 21 days without docking to another spacecraft. Advances in technology for deep space travel such as life support, avionics,…

    Read More »
  • Press Releases

    Preparing for Artemis II: Training for a Mission Around the Moon

    Four astronauts will soon travel beyond low Earth orbit and fly around the Moon on Artemis II, a mission that will test NASA’s systems and hardware for human exploration of deep space.  Since June 2023, NASA astronauts Reid Wiseman, Victor Glover, Christina Koch, and CSA (Canadian Space Agency) astronaut Jeremy Hansen have been preparing for their lunar journey. The approximately 10-day mission will test the SLS (Space Launch…

    Read More »
  • NASA

    I Am Artemis: Doug Parkinson

    Doug Parkinson’s face lights up as he starts telling his story, how someone from  Wisconsin now plays a part in the team that will help land the first Artemis astronauts on to the Moon. Parkinson serves as NASA’s SLS (Space Launch System) rocket lead for Launch Integration and Mission Operations, guiding engineers responsible for monitoring the rocket during testing, pre-launch,…

    Read More »
  • NASA

    NASA Selects Participants to Track Artemis II Mission

    NASA has selected 34 global volunteers to track the Orion spacecraft during the crewed Artemis II mission’s journey around the Moon. The Artemis II test flight will launch NASA’s Space Launch System (SLS) rocket, carrying the Orion spacecraft and a crew of four astronauts, on a mission into deep space. The agency’s second mission in the Artemis campaign is a…

    Read More »
  • NASA

    NASA Conducts Hot Fire of RS-25 Engine

    NASA successfully conducted a hot fire of RS-25 engine No. 2063 on Jan. 22 at the Fred Haise Test Stand at NASA’s Stennis Space Center near Bay St. Louis, Mississippi, clearing the way for the engine to be installed for the agency’s Artemis IV mission.   The RS-25 engines help power NASA’s SLS (Space Launch System) rocket that will carry…

    Read More »
  • NASA

    NASA’s Artemis II Mission to Fly Legacy Keepsakes with Astronaut Crew

    As America approaches its 250th anniversary of declaring independence, NASA’s Artemis II mission will carry a host of mementos that reflect the nation’s long tradition of exploration, innovation, and leadership in its official flight kit. The items will fly aboard the Orion spacecraft, launched on top of the Space Launch System (SLS) rocket, as it carries four astronauts around the…

    Read More »
  • NASA

    NASA’s Artemis II Rocket and Spacecraft Make Their Way to Launch Pad

    This Jan. 17, 2026, image shows NASA’s SLS (Space Launch System) and Orion spacecraft rolling out of the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida. NASA’s massive Crawler-Transporter, upgraded for the Artemis program, carries the powerful SLS rocket and Orion spacecraft to Launch Pad 39B in preparation for the Artemis II mission. Moving at a maximum speed of…

    Read More »
  • NASA

    NASA’s SLS Rocket: Secondary Payloads

    When NASA’s SLS (Space Launch System) rocket launches the agency’s Artemis II mission to the Moon, four CubeSats, or small satellites, will be hitching a ride inside the rocket’s Orion stage adapter (OSA). All four Artemis II CubeSats are provided by countries that are signatories of the Artemis Accords. Payload deployment, which begins approximately five hours after launch, is controlled…

    Read More »
  • NASA

    NASA’s Crawler Preps for Artemis II Rollout

    NASA’s Crawler-transporter 2 moves toward the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida on Friday, Jan. 9, 2026. The crawler will transport NASA’s SLS (Space Launch System) rocket with the Orion spacecraft to Launch Complex 39B ahead of the Artemis II launch which will journey Commander Reid Wiseman, Pilot Victor Glover, and Mission Specialist Christina Koch from NASA, and Mission Specialist…

    Read More »
Back to top button