Slip Risk Assessment Process

  • NASA

    Sols 4505-4506: Up, up and onto the Devil’s Gate 

    Written by Catherine O’Connell-Cooper, Planetary Geologist at University of New Brunswick Earth planning date: Monday, April 7, 2025 Over the weekend, we completed our drive up the steep side of a canyon, up onto “Devil’s Gate,” a small butte which forms part of the ridge along the top of the canyon and now we can see down into the next canyon. It is always true that…

    Read More »
  • NASA

    Sols 4498-4499: Flexing Our Arm Once Again

    Written by Conor Hayes, Graduate Student at York University Earth planning date: Monday, March 31, 2025 Planning today began with two pieces of great news. First, our 50-meter drive (about 164 feet) from the weekend plan completed successfully, bringing us oh-so-close to finally driving out of the small canyon that we’ve been traversing through and toward the “boxwork” structures to our southwest. Second, we…

    Read More »
  • NASA

    Sols 4495-4497: Yawn, Perched, and Rollin’

    Written by Natalie Moore, Mission Operations Specialist at Malin Space Science Systems Earth planning date: Friday, March 28, 2025 Womp, womp. Another SRAP (Slip Risk Assessment Process) issue due to wheels being perched on these massive layered sulfate rocks. With our winter power constraints as tight as they are, though, keeping the arm stowed freed up more time to check some lines…

    Read More »
Back to top button